Home
 About CECIC
 Main Business
 Subordinate Enterprises
 Contact us
 简体中文
   
About CECIC
 Main Business&
Representative Projects
 
  Wind Power and Wind Power Equipment Manufacturer
  Municipal Water Supply and Waste Water Treatment
  Solid Waste Treatment
  New Building Material
  Demonstration of Energy Saving and Resource Comprehensive Utilization Power Generation
  Biomass Energy Development
  Compressed Natural Gas Supply
  Technology & Consulting
 Subordinate Enterprises
 News
 Contact us


Main Business

 
 Wind Power and Wind Power Equipment Manufacturer
  With a vast territory and long coastline, China enjoys rich wind power recourses. Nation-wide, the wind power density at ten meters high is 100 watts/m2 and the wind power reserves that can be exploited on sea and land is about 1 billion kilowatts. CECIC has committed itself to the development of wind power. The introduction and absorption of wind power technology, equipment manufacturing, project construction, and operation maintenance are specific factors that the CECIC focuses on to advance the development of wind power. CECIC plans to have the wind power capacity reach 1000 MW by the year 2012. The wind farm, under construction, will be about 500 MW when it is completed in Hebei, Xinjiang and other provinces. CECIC has a reserve of wind power resources in Inner Mongolia and Gansu of 2000 MW. CECIC has invested and controlled a technologically advanced wind power equipment manufacturer.

Representative Projects
 Wind Power and Wind Power Equipment Manufacturer
  风电 ·Xinjiang Tuoli Wind Power Plant (first phase), 30 MW.
·Hebei Zhangbei Wind Power Projects under construction, total capacity 500 MW.
·Zhejiang Wendey wind power equipment (MW scale) production base.
·Hebei Zhangbei Wind Power Plant (first and second phase), 95 MW.
 

Copyright 2007 CECIC All Rights Reserved